EICR testing in London

EICR and Fixed Wire Testing in London

phs Compliance is part of the award winning phs Group, a national name in facilities management, including Electrical Installation Condition Reports (EICR) and fixed wire testing.

Your local phs office can provide EICR certificates and fixed wire testing in London and the M25 corridor, covering towns such as Ipswich, Reading and Essex, for a range of business sectors including:

​

 

W​hy choose phs Compliance?

 

We carry out over 770,000 fixed wire tests a year

Over 360 trained and qualified engineers covering Bristol, the South West and across the UK

Founded in 1991 phs Compliance has 35 years of experience

Free no obligation quotes across all services

About our engineers

W​e have some of the best electrical engineers in the UK. All have enhanced DBS checks and are all fully qualified with:

    • NVQ Level 3 AM2 Qualified
    • NVQ Level 2 Electrical Systems
    • NVQ Level 3 Installing Electrical Systems
    • City and Guilds: IET Code of Practice 5th, Initial and Periodic Electrical Inspection and Testing and BS7671:2018+A3:2024
 
 

Frequently Asked Questions
​

Is an EICR a legal requirement?

As a commercial landlord or business owner, you have a legal duty under the Electricity at Work Regulations 1989 to keep electrical installations safe. An Electrical Installation Condition Report (EICR) is the recognised way to show that duty is being met.

Do phs carry out EICRs for HMOs and residential landlords?

No, we only carry out EICRs on commercial and industrial property such as offices, schools, shops, warehouses and factories.

How often do I need an EICR?

This depends on the type of property and how it's used. The Electricity at Work Regulations 1989 require that electrical systems are maintained in a safe condition, but don’t specify fixed intervals. These frequencies are industry best practice under BS 7671 (IET Wiring Regulations).

What’s the difference between an EICR and a thermographic survey?

An EICR assesses the overall safety and condition of an electrical installation, while a thermographic survey uses thermal imaging technology to identify overheating components and hidden faults. Using both methods will prevent and fix issues before they happen keeping your business running without sudden power loss and potential financial loss. phs compliance also offer thermographic surveys if needed, keeping all services under one provider.

What’s the difference between Fixed Wire Testing and PAT testing?

An EICR (Electrical Installation Condition Report) inspects the fixed wiring and electrical infrastructure of a building like consumer units, circuits, sockets and earthing. PAT testing (Portable Appliance Testing) equipment that normally runs of sockets such as laptops, kettles and power tools.

phs Compliance provides both EICR and PAT testing services, so you can manage all electrical compliance through a single supplier with one point of contact.

What is the difference between Fixed Wire Testing and EICR?

A fixed wire test is the inspection that is carried out. An EICR is the certificate and report of the test and inspection. Electrical Installation Condition Report (EICR) and Fixed Wire Testing fundamentally refer to the same process.

How much is an EICR certificate?

Cost will vary depending on the size of a building and the complexity of its electrical system. phs Compliance can provide quotes for single or multiple sites. If you have multiple sites, then working with a single supplier can save you money while reducing the amount of time your employees spend on administration.

Are there any areas of the UK you don’t cover?

No, we cover every part of the UK. With one of the largest teams of electricians and fixed wire testers in the industry, our experts are based nationwide meaning we can get to you wherever you are.

What happens if my EICR comes back unsatisfactory?

An unsatisfactory result means remedial work is needed before your installation meets the required standard. Your engineer lists the specific issues found, coded by urgency, so you know what to prioritise. We can then carry out the fixes and remedial works.

How long does an EICR take?

This depends on the size of the building and the number of circuits being tested. We can give you an estimate when you book.

 

 

Other services we provide in London

PAT & EET Testing

PAT & EET Testing

Keep your equipment safe and compliant with nationwide portable appliance testing (PAT) from accredited engineers. Book a visit that fits around your business, with minimal disruption and digital

Find out more
EICR Testing & Fixed Wire Inspection Services

EICR Testing & Fixed Wire Inspection Services

phs Compliance offer a comprehensive Fixed Wire Testing service for businesses across the whole of the UK. As part of this testing, you will be provided with an Electrical Installation Condition

Find out more
Emergency Lighting Testing

Emergency Lighting Testing

Regular inspection and testing of emergency escape lighting is a statutory obligation of building owners and employers under the Regulatory Reform (Fire Safety) Order 2005 as well as a range of

Find out more
Thermographic Surveys

Thermographic Surveys

Regular testing and inspection of your private or commercial building's electrical circuits is essential to ensure compliance with your statutory obligations under The ​Electricity at Work

Find out more
Fire Alarm Testing

Fire Alarm Testing

phs Compliance is one of the UK's leading fully accredited specialists in the testing, servicing and maintenance of fire alarm systems, with nationwide coverage and 160 expert engineers ensuring

Find out more
Fire Extinguisher Servicing & Testing

Fire Extinguisher Servicing & Testing

phs Compliance services extinguishers for single sites and national estates, from offices and shops to warehouses, schools and healthcare buildings. Visits can be booked early, late or at weekends,

Find out more
Fire Risk Assessments

Fire Risk Assessments

It is the responsibility of all employers and building owners to have a regularly updated fire risk assessment conducted to ascertain if the correct fire safety measures are in place and identify

Find out more
Air Conditioning & Heat Pump Leak Checks

Air Conditioning & Heat Pump Leak Checks

Leak testing is required by law for air conditioning systems and components in workplaces, since fluorinated gases can be contained within refrigerant gas used for chilling and cooling.The European

Find out more

 


Accreditations

undefined
undefined
undefined
undefined
undefined
undefined

Latest News

Busting the Top 10 Myths in Compliance

Busting the Top 10 Myths in Compliance

A lot of bad advice can get repeated as fact when it comes to electrical and fire safety. Some compliance myths start with a grain of truth, then get simplified until they become misleading, and

Read article
How Planned Preventative Maintenance (PPM) Saves Cost and Ensures Compliance

How Planned Preventative Maintenance (PPM) Saves Cost and Ensures Compliance

Waiting until something goes wrong often costs more, causes more disruption and costs more than ensuring your appliances are in working order. Not only that, but it can also make it harder to keep

Read article
How Compliance Efforts Support Your Sustainability Goals

How Compliance Efforts Support Your Sustainability Goals

Safety checks and sustainability work are, understandably, treated as separate jobs, but there's actually more overlap between them than people expect. A well-maintained building tends to run more

Read article
Amendment 4 | The electrical regulations your business needs to know | phs Compliance

Amendment 4 | The electrical regulations your business needs to know | phs Compliance

Amendment 4 to BS 7671 is now published and in force. From 15th October 2026, it becomes the only standard that counts. Here’s what’s changed and what you need to do. Key deadline: 15 October

Read article

This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.