Project Services: retail mall  

Owned by a property investment company specialising in retail & leisure, The Mall offers 49,700 m2 of floor space over two levels. 

As part of a major refurbishment, phs Compliance was engaged by our Tier 1 client to upgrade the Mall’s LV electrical power distribution infrastructure and carry out electrical maintenance of the main switch panel.

Built in the mid-1970s and after several renovations, with the most recent being a £6 million modernisation project completed in late 2017 , retail space for the benefit of the local community was significantly improved, along with modernisation of the building infrastructure. 

Our project replaced aged distribution boards located at multiple points across ‘cores’ including risers, walkways, plant rooms, and loading areas. BS88 distribution boards containing re-wireable devices dominate the layout, and asbestos issues also required active management.

phs Compliance’s Project Services team specified all electrical components and systems to latest industry standards. Site waste management planning met statutory obligations arising from the Control of Asbestos Regulations 2012 where we worked closely with our licensed waste partner, and with whom we coordinated collections of WEEE-designated waste.  

To best support efficient low-cost future maintenance responsibilities, phs Compliance installed miniature circuit breakers (MCB’s) rather than rewireable fuses. 

phs Compliance also ensured that the new electrical infrastructure was fully in line with surge protection and arc fault detection requirements as laid out in the IET Wiring Regulations 18th edition. 

We’ve also future-proofed future statutory inspection and test works by ensuring all replacement distribution boards are free of asbestos and have been designed & installed to facilitate easier and more efficient physical access. phs Compliance’s dedicated project team worked hard and efficiently to deliver what our client and end-customer expected, on time and in budget.  

The pre-existing infrastructure was composed of aged 4,6, 8 and 12 way distribution boards with some having separate isolators. Some boards were grouped in pairs or three’s in one location. The client requested that our quotation include costs for the replacement of two boards (a 4 and 6 for example) with one 12-way board and removal of separate isolators. Short runs of 16/25mm SWA were required to extend supply and distribution cables to the new boards.

Whilst installed cables are considered serviceable, our client wanted to update distribution boards to bring the Mall in line with latest BS 7671 standards (IET Wiring Regulations 18th edition). After conducting site surveys and obtaining all layout diagrams, phs Compliance built our 'sliding scales' approach by listing the costs of replacing distribution boards individually rather than a total cost. This provided our client with greater opportunity to accurately determine phased cost and budget periods. By mid-2018 phased budget release for works in each core area was underway.

 

Latest News

How to Keep Your Emergency Lighting Compliant | phs Compliance

How to Keep Your Emergency Lighting Compliant | phs Compliance

Emergency lighting is an essential safety consideration for commercial buildings. If you’re a building manager, you need to understand BS 5266 guidance. This standard outlines a code of practice for

Read article
EICR Compliance for Social Housing in 2026 | phs Compliance

EICR Compliance for Social Housing in 2026 | phs Compliance

As a landlord, EICR compliance is a fundamental responsibility. Electrical safety is vital for protecting your tenants and reducing risks. But as new EICR regulations come into place, what will the

Read article
phs Compliance announces new sales director | phs Compliance

phs Compliance announces new sales director | phs Compliance

phs Compliance has appointed a new sales director as the company continues to grow across the UK. Gary Crockett has joined the team to lead its nationwide sales force. Gary started his career in

Read article
HVAC Preventive Maintenance: Schedule and Best Practices | phs Compliance

HVAC Preventive Maintenance: Schedule and Best Practices | phs Compliance

A heating, ventilation, and air conditioning (HVAC) preventative maintenance plan is the best way to keep your system running efficiently and reliably throughout the year. With a scheduled

Read article

This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.